EISCAT 3D stakeholders meeting
Jump to navigation
Jump to search
EISCAT_3D Support (E3DS) project Stakeholder Forum
Time/Location
Thursday November 5th 2015, Arlanda SkyCity Conference Centre. 09h00 to 16h00
Objectives for the meeting
The E3DS stakeholder forum gathers representatives from the NeIC EISCAT_3D Support project, NeIC, EISCAT, EISCAT_3D users, national e-Infrastructure providers and network providers in order to achieve two goals:
- to update eachother about progress of projects and e-Infrastructure roadmaps, and
- to intensify the collaboration between the EISCAT_3D Support project and the providers for network and e-Infrastructure
to ensure the requirements of the distributed e-Infrastructure for EISCAT_3D can be met.
Agenda
- Meeting chair: Gudmund Høst
- 09h00 - 09h05 Welcome (Gudmund Høst)
- 09h05 - 09h30 Meeting goals (Thomas Röblitz)
- 09h30 - 10h15 EISCAT_3D: status and next steps (Ingemar Häggström) Slides
- 10h15 - 10h30 break
- 10h30 - 10h45 EISCAT_3D: News from the sites (Anders Tjulin) Slides
- 10h45 - 12h00 NeIC EISCAT_3D Support project: status and next steps (John White)Slides
- E3DS would like to receive feedback on the reports produced so far:
- MA-1: Report describing/updating requirements for EISCAT_3D data handling and processing at the operations centre
- MB-1: Describe on-site computing requirements for a test-subarray
- MA-3: Report on the network plan for the EISCAT_3D sites (see slides)
- E3DS would like to receive feedback on the reports produced so far:
- 12h00 - 13h00 Lunch
- 13h00 - 14h45 Presentations from network providers and e-Infrastructure providers
- Emphasis in the talks should be on
- possible contributions to the NeIC E3DS project
- key expertise/competence that may add value to the NeIC E3DS project
- resource planning/procurement issues/opportunities wrt EISCAT_3D project
- 13h00 - 13h10 UNINETT (Vidar Faltinsen)
- 13h10 - 13h20 FUNET (Juha Oinonen)
- 13h20 - 13h30 SUNET (Börje Josefsson)
- 13h30 - 13h40 NORDUnet (Börje Josefsson) Slides
- 13h40 - 14h00 discussion about network issues
- 14h00 - 14h10 CSC (Janne Ignatius) Slides
- 14h10 - 14h20 SNIC (Jacko Koster)
- 14h20 - 14h30 UNINETT-Sigma2 (Gunnar Bøe)
- 14h30 - 14h45 discussion
- Emphasis in the talks should be on
- 14h45 - 15h00 break
- 15h00 - 15h30 Presentations from HPC centres
- 15h30 - 16h00 Conclusions
- Continue with meetings like this (on average every 6 months)
- Smaller meetings focusing on certain aspects
- Initiate deeper collaboration between e-Infrastructure/network providers and the NeIC E3DS project
- What does the E3DS project/EISCAT_3D need?
- What can the providers/HPC centres contribute?
Meeting Notes
Attendees
- EISCAT_3D
- Ingemar Häggström (EISCAT)
- Anders Tjulin (EISCAT)
- EISCAT_3D users
- Esa Turunen (Sodankylä Geophysical Observatory, Finland)
- National e-Infrastructure providers
- Janne Ignatius (CSC, Finland)
- Jacko Koster (SNIC, Sweden)
- Gunnar Bøe (UNINETT Sigma2, Norway)
- Network providers
- Börje Josefsson (SUNET and Nordunet, Sweden/Norden)
- Vidar Faltinsen (UNINETT, Norway)
- Juha Oinonen (CSC/FUNET, Finland)
- HPC centers
- Åke Sandgren (HPC2N, Umeå, Sweden)
- Roy Dragseth (HPC @ University of Tromsø, Norway)
- NeIC
- John White (E3DS project manager)
- Gudmund Høst (Director)
- Mattias Wadenstein (NT1 area coordinator)
- Thomas Röblitz (ENV area coordinator)