EISCAT_3D Support (E3DS) project Stakeholder Forum

Time/Location

Thursday November 5th 2015, Arlanda SkyCity Conference Centre. 09h00 to 16h00

Objectives for the meeting

The E3DS stakeholder forum gathers representatives from the NeIC EISCAT_3D Support project, NeIC, EISCAT, EISCAT_3D users, national e-Infrastructure providers and network providers in order to achieve two goals:

  1. to update eachother about progress of projects and e-Infrastructure roadmaps, and
  2. to intensify the collaboration between the EISCAT_3D Support project and the providers for network and e-Infrastructure

to ensure the requirements of the distributed e-Infrastructure for EISCAT_3D can be met.

Agenda

  • Meeting chair: Gudmund Høst
  • 09h00 - 09h05 Welcome (Gudmund Høst)
  • 09h05 - 09h30 Meeting goals (Thomas Röblitz)
  • 09h30 - 10h15 EISCAT_3D: status and next steps (Ingemar Häggström) Slides
  • 10h15 - 10h30 break
  • 10h30 - 10h45 EISCAT_3D: News from the sites (Anders Tjulin) Slides
  • 10h45 - 12h00 NeIC EISCAT_3D Support project: status and next steps (John White)Slides
    • E3DS would like to receive feedback on the reports produced so far:
      • MA-1: Report describing/updating requirements for EISCAT_3D data handling and processing at the operations centre
      • MB-1: Describe on-site computing requirements for a test-subarray
      • MA-3: Report on the network plan for the EISCAT_3D sites (see slides)
  • 12h00 - 13h00 Lunch
  • 13h00 - 14h45 Presentations from network providers and e-Infrastructure providers
    • Emphasis in the talks should be on
      • possible contributions to the NeIC E3DS project
      • key expertise/competence that may add value to the NeIC E3DS project
      • resource planning/procurement issues/opportunities wrt EISCAT_3D project
    • 13h00 - 13h10 UNINETT (Vidar Faltinsen)
    • 13h10 - 13h20 FUNET (Juha Oinonen)
    • 13h20 - 13h30 SUNET (Börje Josefsson)
    • 13h30 - 13h40 NORDUnet (Börje Josefsson) Slides
    • 13h40 - 14h00 discussion about network issues
    • 14h00 - 14h10 CSC (Janne Ignatius) Slides
    • 14h10 - 14h20 SNIC (Jacko Koster)
    • 14h20 - 14h30 UNINETT-Sigma2 (Gunnar Bøe)
    • 14h30 - 14h45 discussion
  • 14h45 - 15h00 break
  • 15h00 - 15h30 Presentations from HPC centres
    • 15h00 - 15h10 HPC2N, Umeå (Mattias Wadenstein) Slides
    • 15h10 - 15h20 HPC center, UoTromsø (Roy Dragseth) Slides
    • 15h20 - 15h30 discussion
  • 15h30 - 16h00 Conclusions
    • Continue with meetings like this (on average every 6 months)
    • Smaller meetings focusing on certain aspects
    • Initiate deeper collaboration between e-Infrastructure/network providers and the NeIC E3DS project
      • What does the E3DS project/EISCAT_3D need?
      • What can the providers/HPC centres contribute?

Meeting Notes

Meeting notes

Attendees

  • EISCAT_3D
    • Ingemar Häggström (EISCAT)
    • Anders Tjulin (EISCAT)
  • EISCAT_3D users
    • Esa Turunen (Sodankylä Geophysical Observatory, Finland)
  • National e-Infrastructure providers
    • Janne Ignatius (CSC, Finland)
    • Jacko Koster (SNIC, Sweden)
    • Gunnar Bøe (UNINETT Sigma2, Norway)
  • Network providers
    • Börje Josefsson (SUNET and Nordunet, Sweden/Norden)
    • Vidar Faltinsen (UNINETT, Norway)
    • Juha Oinonen (CSC/FUNET, Finland)
  • HPC centers
    • Åke Sandgren (HPC2N, Umeå, Sweden)
    • Roy Dragseth (HPC @ University of Tromsø, Norway)
  • NeIC
    • John White (E3DS project manager)
    • Gudmund Høst (Director)
    • Mattias Wadenstein (NT1 area coordinator)
    • Thomas Röblitz (ENV area coordinator)